XINCHOR

Airport Infrastructure Strengthening

Airport structures face extreme loads from aircraft, constant vibration, and de-icing chemical exposure. Our rapid-set repair and strengthening systems meet the demanding schedules of 24/7 airports.

4 hours
Runway Repair Time
Jet fuel & de-icers
Chemical Resistance
1/5 of steel
CFRP Weight
Zero
Terminal Downtime

Desafíos

Heavy and repeated aircraft wheel loads
De-icing chemical and fuel exposure
Strict operational windows for repair work
Terminal building expansion and reinforcement
Control tower seismic upgrade requirements

Beneficios

Rapid-set mortars — runway re-open in 4 hours
Chemical-resistant epoxy formulations
Lightweight CFRP — no added dead load on terminals
Night-shift installation protocols
Proven in international airport projects

¿Necesita una Solución?

Nuestro equipo diseña esquemas de refuerzo personalizados.